Chicago working fire 1-8-14

Here's a rewritten and improved version of the original content, expanded to meet the 500-character requirement and presented in a more natural, human-like tone: --- This post comes from Drew Gresik: Here are some of my photos from a working fire that took place on January 8th, 2014, at 2661 W 24th Place. These images capture the intense efforts of the Chicago Fire Department during a cold winter day. You can view more of my work on the new site: [chi-townfirephotos.smugmug.com](http://chi-townfirephotos.smugmug.com). Below are some of the shots I took that day. Each image reflects the dedication and bravery of the firefighters as they worked to control the blaze.
Chicago firefighters fight winter building fire

Drew Gresik photo

Chicago firefighters fight winter building fire

Drew Gresik photo

Chicago firefighters fight winter building fire

Drew Gresik photo

Chicago Fire Department fire engine at fire scene

Drew Gresik photo

Transition Joint

Transition Joint,Male Threaded Insert,Male Threaded Fitting,Integrated Flange Hydraulic Hose Assembly Joint

JiangSu Speeder heavy machinery Co., LTD , https://www.speederjoint.com